Send Message
121 Dongan Road, Guangyang District, Langfang City, Hebei Province 86-13930604957
Home ProductsPowder Coating Curing Oven

20-25 Minutes Time Powder Coating Curing Oven Steel Substrate

I'm Online Chat Now

20-25 Minutes Time Powder Coating Curing Oven Steel Substrate

20-25 Minutes Time Powder Coating Curing Oven Steel Substrate
20-25 Minutes Time Powder Coating Curing Oven Steel Substrate 20-25 Minutes Time Powder Coating Curing Oven Steel Substrate 20-25 Minutes Time Powder Coating Curing Oven Steel Substrate 20-25 Minutes Time Powder Coating Curing Oven Steel Substrate 20-25 Minutes Time Powder Coating Curing Oven Steel Substrate

Large Image :  20-25 Minutes Time Powder Coating Curing Oven Steel Substrate

Product Details:

Place of Origin: CHINA
Brand Name: HM

Payment & Shipping Terms:

Minimum Order Quantity: one set
Price: USD 8000-25000
Packaging Details: Stretch film + air cushion film
Delivery Time: 30days
Payment Terms: D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 100 sets one year
Detailed Product Description
Type: Powder Coating Curing Oven Condition: New
Place Of Origin: Hebei, China Warranty: One Year
After-sales Service Provided:: Engineers Available To Service Machinery Overseas Burner: Italy Brand Or Customized
Substrate: Steel Coating: Powder Coating
Voltage: Customized Dimension: According To Workpiece Size
High Light:

25 Minutes Powder Coating Curing Oven

,

25 Minutes powder coating batch oven

,

Steel Substrate Powder Coating Curing Oven

Coating Equipment Electrostatic Powder Coating Machine Booth Oven Production Line System

 

1. Product Description

Whether electrical, gas or diesel fired. Whether batch type or conveyorized tunnel type. Designed and built specially for Powder & Liquid curing

 

purposes assuring you of low power consumption with uniform temperature throughout the working space in the oven.

 

Melting & Curing constitutes a highly critical phase of the powder coating process. The curing schedules recommended by the powder or liquid

 

supplier must be strictly followed, if good adhesion & corrosion resistance is to be achieved. While powder melts at approx.100°C, curing requires

 

higher temperatures usually between 180°C to 200°C.If the curing is inadequate, the quality will be brittle and flake-off easily.

 

 

Equipment list

No.

Name

Parameter

Remarks

1

Circulating fan

Quantity:4-6piece

power:5.5kw/one piece

 

2

burner

Baltur or customized

 

3

Curing time

20-25 mintes

 

4

Curing temperature

180℃—200℃

 

5

Heating time

About 30mintes

 

6

Thickness of insulation board

150mm

 

7

size

According to workpiece size and workpiece output

 

 

 

 

 

 

 

2.Product Pictures

20-25 Minutes Time Powder Coating Curing Oven Steel Substrate 0

20-25 Minutes Time Powder Coating Curing Oven Steel Substrate 1

20-25 Minutes Time Powder Coating Curing Oven Steel Substrate 2

 

20-25 Minutes Time Powder Coating Curing Oven Steel Substrate 3

 

3. Our Service

Pre-Sales Service:

 

* View our Factory.
* Responsible for the reception of visiting customers
* Discussion on design scheme
* Pre-technical support

Afer-Sales Service:

 

* Responsible for cargo transportation and customs clearance, and provide customer customsclearance data

* Field installation, commissioning

* Free training technological operator to ensure the trained staff can operation independently.

4. Packing & Delivery

According to the characteristics of products, transportation, environmental factors .We use foam, cartons, wooden case and other professional

 

packaging, through heavy card, container, bulk carrier and other transportation tools .put the goods safe and timely to the custome

 

20-25 Minutes Time Powder Coating Curing Oven Steel Substrate 4

5. OUR Service:

1. Our warranty is 12 months. Parts have free replacement excluding artificial damage in Warranty. During warranty period, shipping cost of

 

replacement products or parts are our responsibility.Beyond the warranty period, we provide spare parts to customers at factory cost.

 

2. The international terms we can accept FOB/CFR/CIF,we have agent of shipping company with cooperation for more than ten years ,they are

 

very helpful with transportation by sea, express, and air.

 

3. We are welcome to all of the world client to visit our factory.Just tell us what is time you are arrive,we will pick up you in the airport.

 

4. We will send the installation drawings, you can see the installation drawings installed the oven step by step.We can also provide installation

 

service if you need.

6. Buyer Feedback

To provide you more details and quotation, would you pls let me know the following information:
1. What is the max and min size for painted product? Would you pls send us some pictures for your product?
2.The max weight of the workpiece
3. The material of the workpiece
4. How many pieces will you paint in one hour or one day?
5. Do you need to change colors every day? How many colors do you have in total?
6. What is your available space for this powder coating line project(length,width and net height)?
7. What is the heating source?(natural gas,LPG,dieseloil,electricity)
8. What kind of pretreatment system do you need?(sand or shot blasting, dipping tank type or spray pretreatment by chemical liquid?)
9. The local electricity conditions(_V/_Phase/_Hz)
10. Do you have any special requiremnts about the package?
We like to provide you our full suport for your powder coating line project.

Contact Details
Hebei Huanzhou Technology Co., Ltd

Contact Person: Mrs. zhang

Tel: 86-13930604957

Fax: 86-316-5264876

Send your inquiry directly to us (0 / 3000)